Gannett Drive Retrofits

Gannett Drive Retrofits

 

The original subdivision plans for the business park were developed in the late 1980's and focused on flood control by using a detention pond. The existing pond was retrofitted with a settling basin with an inlet gate valve to control stream flow and a gravel underdrained soil filter to remove pollutants.

Project Stats:

  • Installation Date: 2012
  • Total Installation Cost: $0*
  • Cost/Acre Treated: $0
  • Designed by:St. Clair Associates

*Retrofit costs were covered by the landowners.

 

Gannett Drive Settling Basin

 

Supporting Documents and Resources

Gannett Drive Design