Gannett Drive Retrofits
The original subdivision plans for the business park were developed in the late 1980's and focused on flood control by using a detention pond. The existing pond was retrofitted with a settling basin with an inlet gate valve to control stream flow and a gravel underdrained soil filter to remove pollutants.
Project Stats:
- Installation Date: 2012
- Total Installation Cost: $0*
- Cost/Acre Treated: $0
- Designed by:St. Clair Associates
*Retrofit costs were covered by the landowners.