Maine Mall Road Stormwater Treatment

Maine Mall Road Stormwater Treatment

 

Stormwater treatment systems installed adjacent to Maine Mall Road between Gorham Road and Western Avenue intersections treat 8.4 acres of impervious area. Seventeen treatment units were installed along the public right of way and on private properties. These units include:

  • Ten esplanade box filters
  • Three Jellyfish treatment/filter units
  • Three soil media filters


In addition, a detention basin at the Comfort Inn was retrofitted into a bio-retention/filter basin.

Project Stats

  • Installation Date: 2014
  • Total Acres IC Treated: 8.4
  • Total Installation Cost: $682,564
  • Cost/Acre Treated: $81,257,62
  • Designed By: Sebago Technics